Hot sale ceramic filter plate sieving mineral processing plant

- Mar 07, 2018 -

Basic Info

Product Description

  • Delivery Time: 20-25days

  • Sizes: 4115*2775*2140mm

  • Installed Power: 17kw

  • Filter Plate Number: 96PCS

  • Specification: 36000kgs

  • Name: Ceramic Mini Permanent Magnetic Vacuum Filter 

  • Weight: 5000kgs

  • Payment: TT,LC...

  • Operating Power: 13kw

  • Filter Area: 16centiare

  • Origin: Jiangsu, China

Ceramic mini Permanent Magnetic Vacuum Filter

for ore dressing/Filter Press Equipment Cyclone

vacuum Filter for sale

 ceramic disc filter machine.JPG


1.Contact information

Any interest or question, welcome to contact us!

Cathy 
   

TEL / Whatsapp:0086-13901538890
EMAIL: cathyxq@aliyun.com 
 

 

2.Logo or OEM:  according to customer's requirements

 
3.Lead time: The normal Lead time is 2-3months , which depends on the size

 

4.shipping  and Payment terms: 

 

SEA,AIR,FEDEX,TNT, DHL ECT
PAYPAL, WESTER UNION, T/T, LC,ect

 

5.packing

in wooden packaging ,according to customer's requirements 


6.List Of Competitive Advantage  

· We are factory, can provide you high quality, best price  

· Professional employee and effective management    

· Professional trading service  

· Prompt delivery  

· Good service & reputation  

· Large production line 

 

7.After Service


1.Pre-sale services:

1) Selecting equipment type;

2) Designing and fabricating the products in accordance with the special requirements of the clients;

3) Training technical personnel for our clients;

4) Providing construction and technology consultations or working out proper construction schemes for those new, special or difficult projects.


2.Services provided during the sale:

Respect our clients; present the clients with ease, relaxation and a surprise; devote ourselves to improve the total value of our clients.

1) Checking products acceptance ahead of delivery;

2) Introducing the service system to our clients.


3. After-sale services:

Improve the added value of our products, and let the clients free from the using troubles:

1) Assisting the clients preparing for the first construction scheme;

2) Installing and testing the equipments;

3) Training the first-line operators on site;

4) Examining the equipment regularly;

5) Taking the initiatives to eliminate the failure(s)rapidly at site;

 filter press for mine.jpg

 

 

 

Related Products