Polyurethane Plastic

Polyurethane Plastic

Polyurethane elastomer bar Buying Guides Belowing details are important for us to evalute precise cost : a. Usage - outdoor or indoor b. Material c. Density d. Hardness (stiffiness) e. Sizes detail (formal drawing/draft option) f. Color g. Packing h. Product/sample picture (if have) Tip: How to...

Send Inquiry

Product Details

Polyurethane elastomer bar
image001.jpg

Buying Guides
Belowing details are important for us to evalute precise cost:
a. Usage - outdoor or indoor
b. Material
c. Density
d. Hardness (stiffiness)
e. Sizes detail (formal drawing/draft option)
f. Color
g. Packing
h. Product/sample picture (if have)

Tip: How to place an order?
- Send us STP file drawing or above a~g (item h is better if you have) please.
However, we could help to design PU products for you accord to your request.
- Confirming other items with you, such as packing, and shipping way etc.
- All items will be handed in to our related dept for evaluating cost, delivery date for you.
- Sample will be sent you for testing.
- After sample approved, start to mass production.
- Notification of shipping date
- Client feedback and after-sale service.

FAQ
a.I have an idea for a new product, but don't know if it can be manufactured. Can you help?
Yes! We are always happy to work with potential customers to evaluate the technical feasibility of your idea or design and we can advise on materials, tooling and likely set-up costs.
b.Ok, I've decided to go ahead with my project. How long will it take to get my parts?
It can take 3-6 weeks to have the mould tool manufactured depending on the part's complexity and the number of impressions (single or multi). After we have received final approval by you of the new tool, you can expect delivery of parts within 3-5 days.
c.The mould is standard mould price or depends on design?
- Mould price is not standard mould price, it depends on products design, different design with different mould price.

Inquiry